River Dargle Flood Defence Scheme.
These images were taken during the first week of September, 2016.

Constant traffic nowadays with hard material being trucked in and dumped in storage areas along The Slang/Rehills section of the river bank.
Further work is now being undertaken to upgrade the protection of the riverbank edge with the laying down of extra stone material.

Work has finished on the construction of the ‘debris trap’ in the river bed, opposite the Rivervale Apartments complex. This work was begun a few years ago, and halted with the creation of a pit, and the placement of (what I like to call) the 8 Dargle Dolmen stones (upright pillars) – 4 of which are immediately visible to the eye.

The ‘Debris Trap’ consists of 12 concrete elliptical shaped columns approximately 1.6m (5ft) high spaced 0.5m apart across the river channel — essential for trapping any trees or other objects which may flow down the river in flood conditions.

To create proper foundations for the columns, the guys had to drive steel piles deep into the bed of the river. Similar to work done elsewhere. Within that waterproof chamber, they set/poured concrete to build the columns.

That pile driving work here involved a sub-contractor using an excavator-mounted vibratory pile driver – possibly a ‘Movax’ model. That’s the combination they used in 2014 with the work opposite La Vallee.

Posted by O Suave Gigante on 2016-09-29 17:03:55

Tagged: , Komatsu D65PX , CASE CX210 Hydraulic Excavator , Volvo A30E , Volvo A30D , Articulated Dump Truck , Kobelco SK250 , Hydraulic Excavator , Hitachi Hydraulic Excavator , Hitachi – Zaxis 350LC , KOBELCO SK250 LC Dynamic Acera , Mini crawler excavator , New Holland E135SR Hydraulic Excavator , Vincent Dempsey Plant , NEW HOLLAND , Bray , Wicklow , Dargle River , River Dargle , Flood Protection Scheme , The Slang , Fassaroe , River bank engineering , Landscape engineering , River Dargle Flood Defence Scheme , La Vallee , Bray Flood Defence Scheme , A25D Volvo Articulated Hauler 6×6 , Rehill , Dolmen Stones , Dargle Dolmen Stone Set , River Dargle Dolmen Stones , Engineered riverbed , Wills Bros Civil Engineering Contractors , Wills Bros Ltd. , La Vallee landscaping , Bed widening and adaptation works , Alleviating flood risk , In river works , Debris traps , Lowering of the river bed , Lakeside Plant Hire , Ruscon 2000 Slurry Tanker , Volvo EC 480 EL Crawler Excavator , Caterpillar CB-224C , CAT CB-224C smooth drum compact roller , JONS Civil Engineering Co. Ltd. , Sheet pile driving , Sheet pile driving Hydraulic Hammer , Hilliard & Hilltwister Ltd , Heron , Vibratory Hammer , ICE 14RF , Vibration + Noise sensors , Sound and Vibration Monitoring ABC System , Lattice Boom Crawler Crane – 50 ton capacity , 50-ton Crawler Crane , IHI – CCH800-2 Crawler Crane , Movax , Side Grip Sheet Pile Driver , Excavator Mounted Pile Driver , Movax Sonic Side-Grip Vibratory Pile Drivers , Modular Side-Grip Pile Drivers , Bray Harbour , DART Bridge, Bray , Bridge piers , Bridge buttresses


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *